Infrastructure

 

Vidyalaya Infrastructure
I
Area of land  allotted (in acres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on
 
:34.28 Acrs
 
:  Yes Transferred
 
 
:   Yes
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing
 
: (Completed / Incomplete)
 
   Brick Wall
iii
Permanent buildings constructed
 
 
: (CBRI pattern/ CPWD pattern)
 
   boath
iv
School building
 
 
 
: Complete / Incomplete
 
    Complete
v
Dormitories
:  Boys ____1.25_____ Nos.
   with Warden Residence__2___ Nos.
 
 
 
:  Girls ___0.75________ Nos.
   with Warden Residence__2___ Nos.
 
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food
 
 
:  Complete , Area _693.96 sq.mtrs._____
 
 
              one
vii
Principal Residence
 
 
:  No.
viii
Staff Quarters
 
 
 
 
: Type III = ___24___ Nos.
  Type II = ___01____ Nos.
  Type  I  = ___12____ Nos.
  SP Sheds converted into Staff Qrs.:_-_ Nos.
ix
M.P. Hall
 
      
: Available 
x
Workshop
 
       
: Available
xi
Type of O.H. Tank
 
Its capacity
 
Present Status
 
                            
:  Column based
 
35000 litres
 
: Working satisfactory
xii
U.G. tank
 
Its capacity
 
Present Status
 
 
:  _35000__ litres
 
: Working satisfactory
xiii
D.G. Set
 
 
 
 
:  Available
: _Kirloskar___ make
:      25&10____ KV
: Working
: Year of procurement
 
xiv
Sewage Pump
 
: ____-___ H.P.
xv
Water Pump
 
 
: _35000 ltrs._ capacity
xvi
Electrification
 
Electric connection
Sub Station building
Street lighting
 
Numbers of hrs. during day when power supply is available on an average.
 
 
    
 :  Rural Feeder
:  Complete
: _46__ Nos. of Poles
 
: ____20__ hrs.
  
xvii
Playfields
 
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
     
: Available
                                     
:  ___2____Nos.   – Available
                                     
:  ___4____Nos.   – Available
 
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 
 
 
: Potable,  ___1_ Nos.-  working
: Potable, __2__ Nos.-  working
:  __04____ hours supply in a day
xix
Rajiv Gandhi Smriti Van
 
        
:  Available
xx
Fire fighting arrangement
 
          
:  Working
xxi
Last date of cleaning of
(a)   Septic tank
(b)   Water tanks
 
:  30.06.08
:  30.06.08
xxii
Whether area around transformer is fenced
    
:  Yes 
xxiii
Whether open wells, if any, are covered from top
:  
  Not there is the campus
xxiv
Works taken up under M&R fund during current year and last year:-
 
:
 
                   45 Laks
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year