Area of land allotted (in acres)
Whether land transferred in the Name of Samiti
Vidyalaya shifted to permanent buildings on
|
:34.28 Acrs
: Yes Transferred
: Yes
|
||
ii
|
Status of Boundary Wall
a. Brick Wall
b. Barbed wire fencing
|
: (Completed / Incomplete)
Brick Wall
|
||
iii
|
Permanent buildings constructed
|
: (CBRI pattern/ CPWD pattern)
boath
|
||
iv
|
School building
|
: Complete / Incomplete
Complete
|
||
v
|
Dormitories
|
: Boys ____1.25_____ Nos.
with Warden Residence__2___ Nos.
|
||
|
|
: Girls ___0.75________ Nos.
with Warden Residence__2___ Nos.
|
||
vi
|
Kitchen/dining Hall
No. of shifts required for all students to take food
|
: Complete , Area _693.96 sq.mtrs._____
one
|
||
vii
|
Principal Residence
|
: 1 No.
|
||
viii
|
Staff Quarters
|
: Type III = ___24___ Nos.
Type II = ___01____ Nos.
Type I = ___12____ Nos.
SP Sheds converted into Staff Qrs.:_-_ Nos.
|
||
ix
|
M.P. Hall
|
: Available
|
||
x
|
Workshop
|
: Available
|
||
xi
|
Type of O.H. Tank
Its capacity
Present Status
|
: Column based
: 35000 litres
: Working satisfactory
|
||
xii
|
U.G. tank
Its capacity
Present Status
|
: _35000__ litres
: Working satisfactory
|
||
xiii
|
D.G. Set
|
: Available
: _Kirloskar___ make
: 25&10____ KV
: Working
: Year of procurement
|
||
xiv
|
Sewage Pump
|
: ____-___ H.P.
|
||
xv
|
Water Pump
|
: _35000 ltrs._ capacity
|
||
xvi
|
Electrification
Electric connection
Sub Station building
Street lighting
Numbers of hrs. during day when power supply is available on an average.
|
: Rural Feeder
: Complete
: _46__ Nos. of Poles
: ____20__ hrs.
|
||
xvii
|
Playfields
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
|
: Available
: ___2____Nos. – Available
: ___4____Nos. – Available
|
||
xviii
|
Water supply
Tube Well
Hand pump
Connection from PHED
|
: Potable, ___1_ Nos.- working
: Potable, __2__ Nos.- working
: __04____ hours supply in a day
|
||
xix
|
Rajiv Gandhi Smriti Van
|
: Available
|
||
xx
|
Fire fighting arrangement
|
: Working
|
||
xxi
|
Last date of cleaning of
(a) Septic tank
(b) Water tanks
|
: 30.06.08
: 30.06.08
|
||
xxii
|
Whether area around transformer is fenced
|
: Yes
|
||
xxiii
|
Whether open wells, if any, are covered from top
|
:
Not there is the campus
|
||
xxiv
|
Works taken up under M&R fund during current year and last year:-
|
:
45 Laks
|
||
Year
|
Name of work (M&R)
|
Expenditure
(Rs. In lacs)
|
Cumulative expenditure during the year
|
|
|
|
|
|